Both metric size and imperial size are available.
Both normal clip and staked-on alloy end clip are available.

T243830-Plain Tee Grids System

Item Size Thickness Qty/carton Weight/carton Volume/carton Carton Size
Main Tee 24x38x3600mm 0.30mm 30pcs/carton 33.5kg 0.0361m3 3650x215x46mm
Cross Tee 24x26x1200mm 0.30mm 60pcs/carton 15.5kg 0.0175m3 1250×215×65mm
Cross Tee 24x26x600mm 0.30mm 75pcs/carton 9.5kg 0.01328m3 650×215×95mm
Wall Angle 24x24x3000mm 0.40mm 50pcs/carton 25.5kg 0.01374m3 3020×130×35mm

T243230-Plain Tee Grids System

Item Size Thickness Qty/carton Weight/carton Volume/carton Carton Size
Main Tee 24x32x3600mm 0.30mm 30pcs/carton 30kg 0.0314m3 3650x215x40mm
Cross Tee 24x26x1200mm 0.30mm 60pcs/carton 15.5kg 0.0175m3 1250x215x65mm
Cross Tee 24x26x600mm 0.30mm 75pcs/carton 9.5kg 0.01328m3 650x215x95mm
Wall Angle 20x20x3000mm 0.40mm 50pcs/carton 22.5kg 0.01178m3 3020x130x30mm

T243826-Plain Tee Grids System

Item Size Thickness Qty/carton Weight/carton Volume/carton Carton Size
Main Tee 24x38x3600mm 0.26mm 30pcs/carton 31.5kg 0.0361m3 3650x215x46mm
Cross Tee 24x26x1200mm 0.26mm 60pcs/carton 14.5kg 0.0175m3 1250x215x65mm
Cross Tee 24x26x600mm 0.26mm 75pcs/carton 8.5kg 0.01328m3 650x215x95mm
Wall Angle 24x24x3000mm 0.30mm 80pcs/carton 26.5kg 0.0206m3 3020×195×35mm

T243226-Plain Tee Grids System

Item Size Thickness Qty/carton Weight/carton Volume/carton Carton Size
Main Tee 24x32x3600mm 0.26mm 30pcs/carton 27.0kg 0.0314m3 3650x215x40mm
Cross Tee 24x26x1200mm 0.26mm 60pcs/carton 14.5kg 0.0175m3 1250x215x65mm
Cross Tee 24x26x600mm 0.26mm 75pcs/carton 8.5kg 0.01328m3 650x215x95mm
Wall Angle 20x20x3000mm 0.30mm 80pcs/carton 22.5kg 0.02m3 3020x190x35mm

FUT243830-Ceiling Grid System

Item Size Thickness Qty/carton Weight/carton Volume/carton Carton Size
Main Tee 24x38x3600mm 0.30mm 30pcs/carton 3650x215x46mm
Cross Tee 24x26x1200mm 0.30mm 60pcs/carton 1250x215x65mm
Cross Tee 24x26x600mm 0.30mm 75pcs/carton 650x215x95mm
Wall Angle 24x24x3000mm 0.40mm 50pcs/carton 3020x130x35mm

FUT243230-Ceiling Grid System

Item Size Thickness Qty/carton Weight/carton Volume/carton Carton Size
Main Tee 24x32x3600mm 0.30mm 30pcs/carton 3650x215x40mm
Cross Tee 24x26x1200mm 0.30mm 60pcs/carton 1250x215x65mm
Cross Tee 24x26x600mm 0.30mm 75pcs/carton 650x215x95mm
Wall Angle 20x20x3000mm 0.40mm 50pcs/carton 3020x130x30mm
Material: Hot-dipped Galvanized Steel
Surface Finish: Baked polyester paint
Face Dimension: 15/16FAC(24mm)
Profile Type: Exposed Tee
Seismic Rating: C, DEF
Fire Resistance Rating: Fire resistive when used in approved UL Designs.
End Detail – Main Beam: Splice with screws, Staked-on clip (SuperLock)
End Detail – Cross Tee: Staked-on clip
Cross Tee/Main Beam Interface: Override
Reports: ESR-1308
Colors: White321,White367,Mirror,Golden,Silver,Black
Rotary stitched web for additional torsional strength and extra stability
30% recycled content
Step 1: Determine the maximum height of the suspended ceiling. Typically about 4 inches from the existing ceiling joists. This will provide enough space to angle the tiles into place. However, if installing drop lights, then go 6 inches from the joists. Mark the wall and then draw a line around three sides of the room using your level. A 360 degree laser level work best, or use a standard a 3-foot or 4-foot level to draw a line around the entire room. If using a hand level you’ll need to use a chalk line once the marks are made, so you have a straight line. Laser line levels will provide a nice bright red line around the room.
Step 2: Nail or screw in the perimeter molding once the perimeter lines have been established. Drill pilot holes with a drill and a bit for the screw installation. Screw the L-shaped bracket, that came with the grid kit, into place. Use a stud finder to screw them into wall studs, so that the top edge of the bracket lines up with the perimeter line. Cut the molding to fit with tin snips in corners or along oddly shaped walls. For long walls, butt the ends of two pieces of molding. For outside corners miter each bracket at 45 degrees and butt together.
Step 3: Before installing main runners, use string to lay out where the main runners are to go. They will sit perpendicular to the joists and should be 4-feet apart. Measure the length and width of the room from the center of the string runners, so the ceiling appears balanced from side to side, depending on the size tile you are using. Doing this saves time as the string is easier to move than the main runners.
Step 4: Once the string grid for the runners are in place, and you are happy with the balance, install the main runners perpendicular to the joists 4-feet apart. Depending on the type of ceiling grid system you use, the main runners will either be in sections of 4-foot, 6-foot or 8-foot sections that snap together. Support the main runners with 16-gauge wire into eye bolt screws that you will screw into the floor joists about every third joist. Use string stretched between perimeter moldings to determine height of runners. Use a smaller level every 4-feet across the runners as you hang with wires, to keep your runners level all the way across the room.
Step 5: Tie the runners together with the cross tees. Start in the center of the grid to square the grid. Keep in mind the type of system you’ve chosen, either 2 x 4-foot or 2 x 2-foot panels, and place the cross tees in accordingly. It’s a good idea that as the cross tees are placed, place a few tiles in along the way. Not all the tiles should be placed at this time in case you need to move a few of the cross tees.
Step 6:Trim the tiles to fit as needed. If the tile you choose is smooth cut on the finished side, cut on the back side to trim. Always use a sharp utility knife because there will be less dust and better results than with power tools.

Tips and Warnings

Tips:A hanging laser level works better than a standard level for this task. When hanging main runners start both from the same side of the room.
Warnings:Wear gloves and use pliers to bend hanging wire.